A building is newly constructed with cost of Rs. 1cr over a plot of land costing Rs. 70 lacs.

A building is newly constructed with cost of Rs. 1cr over a plot of land costing Rs. 70 lacs. Building consists of 20 flats of area 120m2 each workout monthly standard rent/ flat from the following data

  1. Expected net return from land & building = 7%
  2. Rate of interest on sinking fund = 9%
  3. Life of building = 60 years
  4. Salvage value = 10% of the cost of building
  5. Repairs & maintenance cost = 7% of building cost
  6. Taxes and other outgoings = 25 % of gross rent.
1 Answer
0
22views
Building,cost land cost Total 1,00,00,00070,00,0001,70,00,000
Net return 7100×17000000Total 1190000
Sinking fund Ic =i(1+i)n1=0.09(1+0.09)601Ic=5.14×104Sinking fund instalment=Ic×(costscrap)=5.14×104×(100000000.1×10000000)=4626 -

Repair & maintenance cost =7100×10000000=700000

Gross rent = Net rent + sinking fund + Annual maintenance + outgoings

x=1190000+4626+700000+0.25x

Gross rent =2526168

Therefore Gross rent / month=252616812=Rs.210514Therefore Gross rent / month/flat=21051420=Rs.10526