0
36kviews
Quantities of earthwork for portion of a road

Calculate the quantities of earthwork for portion of a road for a length of 300m with the following data

Chainage(m) 0 30 60 90 120 150 180 210 240 270 300
G.L 171.1 171.2 170.9 171.2 170.8 170.7 170.6 170.4 169.1 169.5 173.7

The formation level at chainage ‘0’ is 170 and the road is in a rising gradient of 1 in 150. The width of formation level in 10m and side slope 1.5:1 in embarkment and 1:1 In cutting. Also calculate the cost of this earth work in banking and cutting. Assume suitable rates and also draw the profile diagram.

Mumbai University > CIVIL > Sem 7 > Quantity survey Estimation and valuation

Marks: 12 M

Year: May 2013

1 Answer
2
596views

enter image description here

enter image description here

enter image description here

$\hspace{14.56cm}$ Total = 1656949.65

$\hspace{13cm}$ Contingency (5%) = 82847.48

$\hspace{9.7cm}$ Working charge Establishment(2.5%) = 41423.74

$\hspace{15cm}$ Total = 1781221

Please log in to add an answer.