written 8.4 years ago by | • modified 6.2 years ago |
Calculate the quantities of earthwork for portion of a road for a length of 300m with the following data
Chainage(m) | 0 | 30 | 60 | 90 | 120 | 150 | 180 | 210 | 240 | 270 | 300 |
---|---|---|---|---|---|---|---|---|---|---|---|
G.L | 171.1 | 171.2 | 170.9 | 171.2 | 170.8 | 170.7 | 170.6 | 170.4 | 169.1 | 169.5 | 173.7 |
The formation level at chainage ‘0’ is 170 and the road is in a rising gradient of 1 in 150. The width of formation level in 10m and side slope 1.5:1 in embarkment and 1:1 In cutting. Also calculate the cost of this earth work in banking and cutting. Assume suitable rates and also draw the profile diagram.
Mumbai University > CIVIL > Sem 7 > Quantity survey Estimation and valuation
Marks: 12 M
Year: May 2013