Prepare an abstract for the cost of the items of work

Mumbai University > CIVIL > Sem 7 > Quantity survey Estimation and valuation

Marks: 8 M

Year: May 2014

1 Answer
0
5views
Srno. Description of work Qty Unit Rate,Rs. Unit of rate Amount
1. Excavation in ordinary soil 60.87 Cu.m 10 Per cu.m 608.7
2. UCR masonry in foundation in CM (1:4) 21.11 cu.m 350 Per cu.m 7388.5
3. RCC quantities for slab band lintel (150 mm thk) and chajja in M25 grade of concrete 8.53 cu.m 823 Per sq.m 7020.19
4. External plastering in CM 1:3, 15mm thk 71.73 Sq.m 15 Per sq.m 1075.9
- - - - - Total = Rs. 16093.34

Total estimated $= Add \ \ 5 \% contingency \ \ + work \ \ charge 2.5 \% \\ \; = Rs. 804.66+ Rs. 402.33 \\ \; = Rs. 17300.33$

Cost = Rs. 17301