written 5.7 years ago by | modified 2.8 years ago by |
(06 Marks) Dec-2018
Subject Fluid Mechanics 2
Topic Pipe Network and water hammer
Difficulty Medium
written 5.7 years ago by | modified 2.8 years ago by |
(06 Marks) Dec-2018
Subject Fluid Mechanics 2
Topic Pipe Network and water hammer
Difficulty Medium
written 5.7 years ago by |
Control measures:
Reduce the pressure of the water supply to the building by fitting a regulator.
Lower fluid velocities. To keep water hammer low, pipe-sizing charts for some applications recommend flow velocity at or below 1.5 m/s (4.9 ft/s)
Fit slowly closing valves. Toilet fill valves are available in a quiet fill type that closes quietly.
High pipeline pressure rating (expensive).
Good pipeline control (start-up and shut-down procedures).
Shorter branch pipe lengths.
Shorter lengths of straight pipe, i.e. add elbows, expansion loops. Water hammer is related to the speed of sound in the fluid, and elbows reduce the influences of pressure waves.