written 5.7 years ago by | • modified 5.7 years ago |
Subject: Production Engineering and Robotics
Difficulty: Medium
Marks: 4 Marks
written 5.7 years ago by | • modified 5.7 years ago |
Subject: Production Engineering and Robotics
Difficulty: Medium
Marks: 4 Marks
written 5.7 years ago by | • modified 5.7 years ago |
[1] Pull Type Manufacturing System:
[1] Just in Time (JIT) is a pull system which is also known as Make to Order Production.
[2] Pull System means that parts are produced to order and the production is matched with demand for the final assembly of products.
[3] In Make to order production system, there is a direct interaction with customers during all the stages but it is expensive during engineering phase.
Characteristics of Pull (Make to Order) Manufacturing System:
[1] Direct interaction with customers
[2] Production schedule changes with changes in customer order
[3] Capacityutilization is lower
[4] Capacity requirements planning are critical
[5] Shop floor control is critical
[6] Distribution is less complicated
Examples: Custom Tailored Clothing, Special Purpose Machinery and product made to customer specifications.