Design the number of gates to serve three classes of airport for obtaining Combined handling capacity of all the gates as 20 aircrafts per hour.

Use following data, assuming that each gate is available for all the aircrafts class assume any other suitable data if required.

Aircraft class Mix (%) Average Occupancy Time (min)
1 15 25
2 35 45
3 50 60
1 Answer
0
135views

Given data: $$ \begin{array}{c|c|c} \text { Aircraft Class } & \text { Mix } & \text { Avg. Occupany time } \\ \hline 1 & 15 \% & 25 \mathrm{~min} \\ 2 & 35 \% & 45 \mathrm{~min} \\ 3 & 50 \% & 60 \mathrm{~min} \end{array} $$

\begin{array}{l} Gate Capacity,GC=\frac{1}{\frac{(15 \times 25)+(35 \times 45)+(50 \times 60)}{100}}\ GC=0.0202 \text { aircraft/min }\ =1.2 \text { aircraft/hr }\ =29 \text { aircraft/day } \end{array}