0
4.4kviews
Estimate the quantity of earthwork from chainage 20 to 26 measured with standard 20m chain from the data:
written 6.2 years ago by | • modified 5.2 years ago |
The formation level at chainage 20 is 88.5 and road has a rising gradient of 1 in 100.The formation width of road is 10m and side slope in cutting 1:1 and banking 2:1.
ADD COMMENT
EDIT
1 Answer