written 7.4 years ago by |
Building Construction - May 2015
Civil Engineering (Semester 4)
TOTAL MARKS:
TOTAL TIME: HOURS
1 (a) Describe various causes of failure of foundation and their remedial measures.(7 marks)
1 (b) Give a point wise comparison between stone and brick masonry.(7 marks)
2 (a) Write short note on
(1) Ashlar masonry
(2) Rubble masonry(7 marks)
Answer any one question from Q2 (b) & Q2 (c)
2 (b) Describe objectives of subsurface investigation and discuss wash boring in detail.(7 marks)
2 (c) Define the following terms
(1) Header (2) Stretcher (3) Corbel (4) Coping (5) Throating (6) Quoin header (7) Cornice(7 marks)
Answer any two question from Q3 (a), (b) & Q3 (c), (d)
3 (a) Describe a point wise comparison between English bond and Flemish bond.(7 marks)
3 (b) Write a short note on
(1) Hollow concrete block construction
(2) Cavity walls(7 marks)
3 (c) Draw a label diagram of typical door and define its each component.(7 marks)
3 (d) Describe the factors affecting selection of size, shape and location of window.(7 marks)
Answer any two question from Q4 (a), (b) & Q4 (c), (b)
4 (a) rite a short note on (with figure)
(1) Louvered window
(2) Bay Window(7 marks)
4 (b) Define the following terms in relation of stairs
(1) Tread (2) Riser (3) Going (4) Scotia (5) Baluster (6) String (7) Waist(7 marks)
4 (c) Describe the factors affecting the selection flooring material.(7 marks)
4 (d) Write a short note on
(1) Timber flooring
(2) Reinforced concrete flooring(7 marks)
Answer any two question from Q5(a), (b) & Q5 (c), (d)
5 (a) Define the following terms in relation to roof
(1)Ridge (2) Valley (3) Eaves (4) Common rafter (5) Purlin (6) Cleat (7) Gable(7 marks)
5 (b) Write a short note on
(1) Roof covering (2) Queen post roof truss(7 marks)
5 (c) Write a short note on:
1) Pointing
(2) Plastering(7 marks)
5 (d) Write a short note on
(1) Scaffolding
(2) Underpinning(7 marks)