Hydrology & Water Resources Engineering - Dec 2014
Civil Engineering (Semester 5)
TOTAL MARKS:
TOTAL TIME: HOURS
1 (a) Discuss various causes of drought.(7 marks) 1 (b) Discuss water resources planning and its objectives.(7 marks) 2 (a) Explain the methods of estimating flood.(7 marks) 2 (b) Describe the flood routing with neat sketch.(7 marks)
Differentiate between following
2 (c) 1 Flood proofing and Flood forecasting(4 marks)
2 (c) 2 Flood walls and Flood ways.(3 marks)
3 (a) Describe the process of the hydrological cycle with a neat sketch(7 marks)
3 (b) In a watershed, the average annual precipitation for four sub-basins was recorded as follows: 100.84,112.27,84.84 & 73.406 cm. the areas of the sub-basins were : 93264.3, 71243.5, 108808.2 & 168393.8 ha., calculate the average precipitation of the total watershed using the Thiessen method.(7 marks)
3 (c) Discuss the various methods used to measure rate of evaporation from a reservoir.(7 marks)
3 (d) The excess rainfall (direct runoff ) produced from a 10.0 cm rainfall of a storm is 6.0
cm. the rainfall at each hour of the storm recorded by a rain gauge is as under.
Calculate the infiltration index of the storm.
Time (h) | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 |
Incremental rainfall (cm) | 0.1 | 1.0 | 1.4 | 2.6 | 2.0 | 1.5 | 1.0 | 0.4 |
<colgroup span="14" style="text-align: center;" width="85"> </colgroup>
Time (h) | 0 | 6 | 12 | 18 | 24 | 30 | 36 | 42 | 48 | 54 | 60 | 66 | 72 |
Direct runoff (m3/s) | 0 | 25 | 175 | 320 | 360 | 310 | 230 | 165 | 105 | 60 | 30 | 10 | 0 |