written 7.9 years ago by |
Embedded System & Real Time Programming - May 2015
Electronics Engineering (Semester 8)
TOTAL MARKS: 80
TOTAL TIME: 3 HOURS
(1) Question 1 is compulsory.
(2) Attempt any three from the remaining questions.
(3) Assume data if required.
(4) Figures to the right indicate full marks.
1 (a) Explain low power modes of MSP430 with the help of clock modules.(5 marks)
1 (b) What are the challenges in meeting various design metric/requirements. Explain for:
i) Low power
ii) High performance(5 marks)
1 (c) Explain serial communication SCI & SPI, compare the same.(5 marks)
1 (d) Compare various scheduling policies.(5 marks)
2 (a) Explain parallel peripherals of MSP430.(10 marks)
2 (b) Explain CAN features and protocols.(10 marks)
3 (a) Explain various modifiers and their purpose and use in an embedded system.(10 marks)
3 (b) Compare assembly language programming with c-programming.(5 marks)
3 (c) Compare ARM state with THUMB state.(5 marks)
4 (a) Explain interrupt/exceptions and its handling in ARM.(5 marks)
4 (b) With the help of suitable diagram give difference between RS485 and RS232, also compare its characteristics, features.(10 marks)
4 (c) Compare, explain various operating modes of ARM.(5 marks)
5 (a) In a real time having periodic Tasks T1, T2, T3 and aperiodic task T4 all requesting at time t=0 having following properties.
i) Calculate utilisation ratios and hence comment on scheduling.
ii) Graphically illustrate the scheduling scheme
iii) Determine if the tasks can meet deadlines.
Task | Period | Execution Time | Deadline |
T1 T2 T3 T4 |
210 70 140 aperiodic |
70 21 28 80 |
210 70 140 420 |
i) Develop and draw functional model using FSM.
ii) Develop and draw block diagram representing hardware modules/blocks.
iii) Suggest list of components with proper justification for the selection (from several options available)(20 marks)
Write short notes on any three:
7 (a) Black box and white box testing.(7 marks) 7 (b) Comparison between ASIC and SOC.(7 marks) 7 (c) Preprocessor directives.(7 marks) 7 (d) Pre-emptive and non pre-emptive scheduling comparison.(7 marks)