written 8.7 years ago by |
Software Engineering - May 2013
Computer Engineering (Semester 6)
TOTAL MARKS: 80
TOTAL TIME: 3 HOURS
(1) Question 1 is compulsory.
(2) Attempt any three from the remaining questions.
(3) Assume data if required.
(4) Figures to the right indicate full marks.
1 (a) Justify any guidelines of metric with respect to your project of choice. Explain it with suitable diagram.(10 marks)
1 (b) How would you reduce the maintenance cost of software and increase the re-usability of above project of choice.(10 marks)
2 (a) Design a RMMM plan for a database project. Explain the plan with at least five risks and analysis the same.(10 marks)
2 (b) What is the importance of change control? Explain it with configuration items and baselines.(10 marks)
3 (a) What are the different tasks of software configuration management?(10 marks)
3 (b) Justify the requirement of object oriented software engineering. Which tests play important role in object oriented context?(10 marks)
4 (a) List and explain the fundamental concepts for software design.(10 marks)
4 (b) Which tests are carried out during verification and validation? Explain in detail.(10 marks)
5 (a) Explain the different techniques of software requirement analysis.(10 marks)
5 (b) Discuss the software project planning with the help of SRS.(10 marks)
6 (a) List and explain the activities of version control.(10 marks)
6 (b) Explain basis path testing and cyclometric complex with example and diagram.(10 marks)
Write short notes on (any two)
7 (a) User interface design principles(10 marks) 7 (b) Empirical estimation model(10 marks) 7 (c) CMM(10 marks)